Renovation downstairs

Workmen have been wiring up the electrical panels in the tower’s downstairs room, and moving the internal walls to get a larger doorway.

Portions of the old walls were taken out.

The end of the old plenum was concreted over at floor level, the wall behind the ducts was cut back and the light switch moved, and a new angled wall was put in place.

Advertisements